Lawrence Berkeley National Lab Integrative Genomics Building

September 12, 2016

This new 78,500 square foot genomics research building and central offices will consolidate the existing Joint Genome Institute and the Systems Biology Knowledgebase group. The new facility will be the first building of the new Biosciences quad at LBNL, which is planned for a final 500,000 square foot build-out. The Biosciences group will be a…

CalTech Thomas Laboratory of Engineering

September 2, 2016

The Thomas Laboratory is located on the famous campus of the California Institute of Technology. Originally built in 1945, this historic building now exceeds standard practices for energy efficiency. The foremost goal of the project was to meet the rigorous needs of the building users while also targeting an annual energy use reduction of up…

Pomona College Millikan Laboratory & Andrew Science Hall

September 1, 2016

The Millikan Laboratory, originally constructed in 1958 on the Pomona College campus, was renovated to significantly upgrade all major systems and increase programmable space. The space currently houses the Physics and Astronomy Department and the Mathematics Department. The upgrades will include: physics laboratories, both teaching and specialized, machine shops, a computer lab, teaching spaces, faculty…

Imperial College Bone Laboratories

August 17, 2016

Elementa have been involved with a number of feasibility studies considering the extension and remodelling of the Bone Building. The Bone Building is a Victorian structure tightly bounded on all sides by other buildings on Imperial College South Kensington site. From these studies the University’s Faculty of Chemical Engineering decided to convert a number of…

University of Exeter Biosciences Department

This project comprised the refurbishment of the iconic and listed Geoffrey Pope building to enhance the research and teaching facilities as well as support the University’s ambitions to be a leading international centre for research and teaching in biosciences. The completed refurbishment provides: Fully operational BSL3 research suite, 3 high quality research facilities to BSL2…

King’s College London Rayne Institute

Elementa were appointed by King’s College London to design the echanical, Electrical and Public Health systems for the refurbishment of the Ventilation Systems at the Division of Imaging Sciences and Biomedical Engineering of the Rayne Institute located on the 4th Floor of St Thomas’ Hospital, London. The scope of the project at the Rayne Institute…

Musgrove Park Hospital Pathology Department

August 8, 2016

Following the successful completion of a new Pathology Centre in Taunton, the client requested the same development and design team undertake the remodeling of the old Pathology department within Musgrove Park Hospital, to undertake the acute pathology services which could not be transferred to the larger “Hub” Laboratory. Located within the heart of the existing…

IPP Pathology Laboratory

This project involved the full redevelopment of an old manufacturing facility to provide a “Hub” Laboratory to serve much of the South West’s pathology demands. Requiring new ventilation, air conditioning, lighting, fire alarm, domestic water, conditioned (purified) water and security systems, this project was a full redevelopment within the existing “shell”. The building includes many…

Institute of Reproductive Sciences

This project involved the construction of a purpose built facility for a world class fertility unit and reproductive research unit. This is the first purpose designed Clinical Research facility into IVF treatments and will be based upon German exemplar facilities. The Oxford Fertility Unit is a national and international leader in research into fertility and…

Frimley Park Hospital Pathology Department

Having previously worked with this trust for some years and following being appointed to the hospital’s framework, we were appointed to provide a full duties service for a significant remodelling of the Pathology Department in the centre of the hospital. The project included both new build and refurbishment on a rolling phased basis and within…